TOG Shed Full to Capacity

14 June.

Winter time means many small jobs that could be done outside in the summer without weather related delays need to be done inside. The TOG shed is bursting at the seams with the arrival of the 18metre launch Waikomouri for some cosmetic touch up work, antifouling, Propspeed and replacement of the teak swim platform surface.

Nestled in behind her on the right is the Senior designed yacht Aggression who is having a full refit. Please see our Projects page for more information. On the left is the little Townson 28 Trill who is in the final stages of her refit and behind her the 16metre launch Nika Sia - also in for a major refit.

TOG Shed Full!